Which statement best describes the 50m/24hr provision for stonedusting?

Study for the Queensland Coal Mining Ventilation Officer Law Exam. Study with flashcards and multiple choice questions, each question has hints and explanations. Get ready for your exam!

Multiple Choice

Which statement best describes the 50m/24hr provision for stonedusting?

Explanation:
Stonedusting is used to control coal dust and prevent explosions, so the timing rules are about keeping that control up as roadway is advanced. For every 50 meters of roadway that has been driven, the stonedusting should be done either immediately or within 24 hours of driving. The provision also allows an exemption if there is enough natural moisture in the operation to prevent a coal dust explosion, meaning dusting isn’t required in that case. Because these aspects all describe how the 50m/24hr rule can be applied and when an exemption may apply, the best description is that all of the above are correct.

Stonedusting is used to control coal dust and prevent explosions, so the timing rules are about keeping that control up as roadway is advanced. For every 50 meters of roadway that has been driven, the stonedusting should be done either immediately or within 24 hours of driving. The provision also allows an exemption if there is enough natural moisture in the operation to prevent a coal dust explosion, meaning dusting isn’t required in that case. Because these aspects all describe how the 50m/24hr rule can be applied and when an exemption may apply, the best description is that all of the above are correct.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy